Master Bedroom and Bathroom – Uncompleted Items.
- change copyright from “2017” to 2014-(current year). - Low - Not Started
- safari mobile – tons of devtool errors – please check - High Priority - Not Started
- safari mobile browser – not working well with speaker tape template of speaker template – largest portion of site visitors - High Priority - Not Started
- please check 1phone 6s safari browser on any speaker tape page – it appears the player is not looking right. - High Priority - Not Started
- overview of the Toolset Plugin (video) - Urgent - Not Started
- please comment all code changes with some kind of signature that it was your agency that did it – PLEASE!! - High Priority - Not Started
- CSS is off with add wrapping: https://www.recoveryaudio.org/best-aa-speaker-tapes - High Priority - Not Started
- Are you familiar with WP-Toolset? - High Priority - Not Started
- Change permalinks to https - High Priority - Not Started
- Post tags not showing on speaker tape pages - High Priority - Not Started
- Desktop menu padding – is it too much: - High Priority - Not Started
- Please edit all containers for all viewports/devices to fit ads (attached) - Urgent - Not Started
- Home page only Add following: - High Priority - Not Started
- Live site – hitting update on pages cycles through repeating updates without stopping - High Priority - Not Started
- Add a nice css container around all the speaker tape speaker name, ratings, the tape player, and tags. - High Priority - Not Started
- Add ezoic add code into search loop and into a views loop (toolset) every 10 posts – low priority - Low - Not Started
- scrub light switches - High Priority - Not Started
- touch up top of bedroom hinge with trim paint - High Priority - Not Started
- trim trees - High Priority - Not Started
- power wash front & back windows, clean drains - High Priority - Not Started
- install soap dishes, master bath, dining bath, rear bath. – check with prasert/pon - High Priority - Not Started
- get carpenter and cabinet builders phone and Line information for future work - Urgent - Not Started
- check that all new water heaters work properly (master bath, dining bath, rear bath) - High Priority - Not Started
- Mosquito Net quote from Windsor/bangkok - High Priority - Not Started
- Front room Granite – have painters paint the grout brown to match where the granite and woodwork meet on the sides. - High Priority - Not Started
- regrout front room granite – matching grout to granite color. - High Priority - Not Started
- final coat polyurethane on stairs (after the conscrtuction is done) - High Priority - Not Started
- Trim latex topper down to fit bed properly in master bedroom - High Priority - Not Started
- 3rd request – hang master bath door properly – no self-closing. - Urgent -
- Master bedroom – move bed away from wall for access to windows for painting/window locks. - Urgent - Not Started
- install front door lock - High Priority - Not Started
- install secure door to shed - High Priority - Not Started
- install new locks – rear bedrooms - High Priority - Not Started
- Install base molding to front room woodwork - High Priority - Not Started
- Paint INSIDE of all windows White semi gloss (NOT OUTSIDE) - High Priority - In Progress
- Install some kind of shelf in the rear shower for shampoo, soap, a place to set a phone, etc. - Low - Not Started
- New Hinges are missing screws everywhere – check them all, make sure they are the matching screws that came with the hinge – - High Priority - Not Started
- Install new kitchen door lock (will be provided) - High Priority -
- buy grout sealer, buy syringes from pharmacy - Urgent - Not Started
- Finish off sides terrace seat and floor - High Priority - Not Started
- Bothavorn – 4 watt eve lights. - High Priority -
- TV boxes from alec - High Priority - Not Started
- John – Order Beds and Toppers - High Priority - Not Started
- pick up spare tiles from shop - Low - Not Started
- TV Mounts – Kitchen and 2nd bedroom - High Priority -
- Cabinet Contrctor – Build simple matching tv stand to raise tv height 27cm - High Priority - In Progress
- Find Matching Post Caps, install on posts that don’t have them. - Low - Not Started, Needs Specification
- Paint this access door - High Priority - Not Started
- Updated BOQ - Urgent - Not Started, Not Started, Needs Specification
- Roof Repairs - Urgent - Not Started, Needs Specification
Master Bedroom and Bathroom – Complete.
- Master Bedroom Plastering Touch Up - Uncategorized - Complete
- Crown Molding Installation - High Priority - Complete
- Window Covering Provider? - Urgent - Complete
- Master Bathroom – Shower Curtain Installation – When? - High Priority - Complete
- john – purchase basic haerle bolts and handles - High Priority - Complete
- Sam Ask Pon – New Mosquito Screens – What is delivery installation timeframe? - High Priority - Complete
- Install Windows – Front Room and Kitchen - High Priority - Complete
- Sam ask Pon Please – What Day/Date will new Cable TV lines be installed? - Urgent - Complete
- Dining Room Bath – Jamb Finishing? - High Priority - Complete
- Dining room bath – install privacy glass - High Priority - Complete
- Master Bedroom – Remove Ceiling texture. - Urgent - Complete
- Master Bedroom Furniture – Specifications and Ordering - Medium - Complete
- Kitchen and Entry – grout specification - High Priority - Complete
- Dining Room – Finish Plaster work at Ceiling Hole - High Priority - Complete
- Rear bedroom – Remove Window, fill hole. - Uncategorized - Complete
- Windows – Rear Bedroom, Storage, and Bathroom – What is timeframe? - High Priority - Complete
- Rear bedroom – Remove board and chalk board - Medium - Complete
- Front Stair and Terrace Finishing? - Medium - Complete
- Specs/Ordering for Master Bath Finishes - High Priority - Complete
- Pre-wiring electrical to terrace/bedroom for lighting before tile and master bedroom wall finishing? - Urgent - Complete
- Get Paint Specifications Document from Ann or Pon - High Priority - Complete
- Relocate True Satellite dish? - High Priority - Complete
- CCTV Consultation? - Low - Complete
- Granite installation - High Priority - Complete
- Wire Nuts for All Electrical Connection – No Twisted wire with Electrical tape. - High Priority - Complete
- Float Ceiling Down to Crown Molding - High Priority - Complete
- Cable TV Wiring Installation – Please ask Pon when it Begins? - High Priority - Complete
- Window Refinishing – Master Bedroom - High Priority - Complete
- Front Room Teak Refinishing - Low - Complete
- Window Exterior finishing and re-hinging – What is project timeline? - High Priority - Complete
- Order Fixtures and Furnishings for Dining Room Bath - High Priority - Complete
- No light switch next to dads bed - High Priority - Complete
- AC to ceiling joint finishing - High Priority - Complete
- Change light fixtures in hallway - High Priority - Complete
- Window Glass Specification? - Urgent - Complete
- Build Platform to Raise Dad’s Bed 15cm - High Priority - Complete
- Need ceiling lamp for dads room - High Priority - Complete
- New Doors not flush to jamb – out of plumb & Master Bath door Damaged at Lock - High Priority - Complete
- Sam – Install light fixtures upstairs bedroom, closet, bathroom. - High Priority - Complete
- Install Kitchen Ceiling fan - High Priority - Complete
- Exterior Window Frame Color – natural teak or painted? - High Priority - Complete
- Bottom Sliding Door – weatherproofing & insect barrier? - High Priority - Complete
- ceiling texture – 1 more coat of paint please - Urgent - Complete
- Yes or no – friction hinges for new windows? - Urgent - Complete
- Sam – Cancel grout sealer application- !! - High Priority - Complete
- Window slide bolt an handles – John to buy basic hardware. - Urgent - Complete
- Refinish Interior Window Frames to Natural Teak – Advise Painters! - High Priority - Complete
- Painting Schedule? - High Priority - Complete
- Front room and kitchen window installation schedule? - High Priority - Complete
- Install Magnet door stops Master bedroom and Bathroom - High Priority - Complete
- Install AC rear Bedroom - High Priority - Complete
- Master Bedroom Rubber Tile installation schedule – May 7 - High Priority - Complete
- Grout in living room done may 4 – furniture comes may 5 - High Priority - Complete
- Living room paint, ceiling fans, and woodwork must be done by may 4 – all dust/dirt mis be kept out by all means possible. Please acknowledge. - Urgent - Complete
- PIease spec and install friction hinges to all new window installallations in living room and kitchen. Please acknowledge that this has been told to window installer - Urgent - Complete
- All paint thinners not being used are to be closed and kept out of the house - Urgent - Complete
- Window Refinishing timeline and dust mitigation – needs english discussion - High Priority - Complete
- Requires English discussion – Do not refinish interior window frames/casings unless it they can be sanded by May 5 – we will have to paint due to it being too late in the project to now to create dust and thinner fumes. - Urgent - Complete
- Do not sand windows near swimming pool – dust! - Urgent - Complete
- More refinishing needed – New doors and windows - High Priority - Complete
- Master Bedroom Baseboards - High Priority - Complete
- Master Bedroom and Bathroom Painting - High Priority - Complete
- Confirm this 12″ Friction Hinge is a Good Specification for All Windows - Urgent - Complete
- Install water heaters – Dining room bath and Maid’s area bath (Water heaters have been bought) - High Priority - Complete
- Mixed warm and daylight LED’s in Bedroom Soffit? - High Priority - Complete
- John – Pick up one more flat LED and more ceiling lights. - High Priority - Complete
- Install Electrical Outlet kitchen corner for TV - High Priority - Complete
- john- new coffee maker - Urgent - Complete
- Evaluate Front Room AC’s for swap. - Uncategorized - Complete
- Compressor setup - High Priority - Complete
- pick up bike - High Priority - Complete, Not Started
- buy new ac remotes - Low - Complete
- delay sofa delivery - High Priority - Complete
- Semi gloss paint being used on Dad’s walls – needs 7938 Matte Dura clean - Urgent - Complete
- craft paper to protect floors - High Priority - Complete
- Delivery Paint Spec Document to Preshar - Urgent - Complete
- Patch hole in ceiling in front porch - High Priority - Complete
- pay somsak, withdraw cash - High Priority - Complete
- somsak payments to date - Uncategorized - Complete
- inspect and clean varnish spots from tiles - High Priority - Complete
- buy compressor - High Priority - Complete
- ceiling fan wobbling – Pon to contact Boonthavorn - High Priority - Complete
- Paint kitchen – 2nd Coat. - High Priority - Complete
- remove wall sconce 2nd bedroom - High Priority - Complete
- Paint Second Bedroom – 2nd coat - High Priority - Complete
- paint office – 2nd coat - High Priority - Complete
- paint dining room - High Priority - Complete
- Finish plaster work Dining Room bath - High Priority - Complete
- Buy dropcloths and masking tape - High Priority - Complete
- Finish Soffit plaster work, specially edges, repaint - Urgent - Complete
- Somsak to buy terrace light, install (per Jane) - High Priority - Complete
- What is this cabinet space for, how is it used? - High Priority - Complete
- Shower fixture is too low – wrong spec, not installed high enough. can this be fixed? - High Priority - Complete
- Thoroughly clean dust from AC, top and bottom - High Priority - Complete
- vacuum all dust from inside soffit after plaster work - High Priority - Complete
- Clean Paint from AC line, consider painting to match wall color. - High Priority - Complete
- swap all to 6w lights - High Priority - Complete
- Add trim molding to window to cover gap created by hinge installation. - High Priority - Complete
- buy new AC’s - Urgent - Complete
- Pick up phone - Medium - Complete, Not Started
- Paint my dropcloths - High Priority - Complete
- Determine Exterior Paint color number? - High Priority - Complete
- messy paint work! - High Priority - Complete
- itch cream - Uncategorized - Complete, Not Started
- Window handle and bolt installation – must be done precisely!! - High Priority - Complete
- Move Dad’s bed into his bedroom – after floor install - Medium - Complete
- install kitchen tv after 2nd coat of paint - High Priority - Complete
- Urgent – Standing water, slope problem in master bathroom - Urgent - Complete
- Master Bedroom Light not installed flush with ceiling, clean blemish on glass, install decorative cap - High Priority - Complete
- ceiling fan is not installed level. - High Priority - Complete
- pick up & install matching door handles (probably should be locking type) - High Priority - Complete
- All Walls Properly Prepared before Painting!! - High Priority - Complete
- install dining room ceiling fan - High Priority - Complete
- 2nd coat of paint – Thai Kitchen/ rear area - High Priority - Complete
- dining room – ceiling needs WHITE paint per Spec, walls get 2nd coat. - High Priority - Complete
- install quarter rounds to all 1st floor windows, paint with primer - High Priority - Complete
- Pick up TOA T001 Semi Gloss (Dura Clean) - Urgent - Complete
- Rubber tiles need to go under baseboards – not butt up to baseboards – pull baseboards if necessary and reinstall after tiles are installed. - Urgent - Complete
- install 32″ TV to kitchen with articulating mount – confirm height - Uncategorized - Complete
- Are contractors/workers leaving any spare tiles behind (both rubber and ceramic)? - High Priority - Complete
- Order rubber tile for rear bedrooms - Urgent - Complete
- Smooth out rough plaster work Master bedroom - High Priority - Complete
- Paint crown molding brown in second bedroom - High Priority - Complete
- AFTER Windows are Hung Properly (John to fix)- make window lock shims, pre-drill holes so it doenst crack wood, go out and purchase proper size screws for the job (security), not whatever may be lying around - High Priority - Complete
- mosquito screen appointment – what time - High Priority - Complete
- install magnetic door stop master bath door - High Priority - Complete
- Confirm Master Bath Venting is proper (that vent tube is attached to vent on outside) - Urgent - Complete
- patch holes in living room woodwork where TV bracket was - High Priority - Complete
- assemble TV in master bedroom, check height - High Priority - Complete
- Sam – Quote from Mosquito net guy - High Priority - Complete
- Master Bathroom install plumbing fixtures - Urgent - Complete
- rear bathroom water heater not working – but proper hose fittings (Sam) - High Priority - Complete
- install mirror master bath - High Priority - Complete
- Clean/scrub grout 2nd bedroom and office - High Priority - Complete
- Master bed room toilet upper tank is loose - Urgent - Complete
- drill small hole in Front room Granite for TV cabling – determine and check placement of this hole with me before drilling it. - High Priority - Complete
- Set up appointment with True TV Cable for installation and 5 TV boxes with remotes – ask Cable TV guy about this. - Urgent - Complete
- finish plastering/painting kitchen ceiling, tell the electrician to use a dropcloth for dust, and to clean up after himself – he left a huge and unnecessary mess yesterday that I had to clean up and I was pissed – laziness. - Urgent - Complete
- clean all excess grout and smearing from all master bathroom walls - High Priority - Complete
- install rubber tile rear bedrooms - Urgent - Complete
- Master bedroom – very slow shower drain - Urgent - Complete
- Dining Room Bath Door – Does not Close! - Urgent - Complete
- Unacceptable Gaps in window installations – John will fix with carpenter seperately - Urgent - Complete
- re-caulk master bath sink basin - High Priority - Complete
- complete window and glazing installation - Urgent - Complete
- regrout 2nd bedroom and office, buy matching grout - Urgent - Complete
- Check details with john first – Tear out master bath tile, establish drain placement, reinstall with proper slope (no standing water) - Urgent - Complete
- Guest bath door out of plumb (wall was out of plumb) - Urgent - Complete
- replace kitchen ceiling light, use 5w bulbs - High Priority - Complete
- window mullion patching and lacquer refinishing - Urgent - Complete
- Change swing of front room window (above granite) - Urgent - Complete
- Fix gap in kitchen window – its at least 2cm – replace and rehang if needed - Urgent - Complete
- John & Sam goto True move - Urgent - Complete
- pick up hinges - High Priority - Complete
- Asssemble 2nd bedroom furniture once grout is done. - Urgent - Complete
- trim bottom of rear bedroom door - High Priority - Complete, Not Started
- pick up artwork saturday - High Priority - Complete, Not Started
- replace buzzer & doorbell buttons - Uncategorized - Complete
- MEASURE CURTAIN, buy hooks and curtain - Uncategorized - Complete
- white silicone on stair all the way down to last stair - Uncategorized - Complete
- sand down patch where old doorbell was - Uncategorized - Complete
- install 7″ flue cap to roof - High Priority - Complete
- Editing comment replies leaves them with blank space - Uncategorized - Complete
- finish deep cleaning - High Priority - Complete
- “Best AA speakers page” not working - High Priority - Complete
- basic html is flashing before theme load on a page - Uncategorized - Complete
- lower page load speeds - Uncategorized - Complete
- please erase the following text in “post” table – “content” column of DB - Uncategorized - Complete
- remove “Categorized in xxxx” text from aa speaker tapes template - Uncategorized - Complete
- Alanon Icon on home page pointing to different list of tapes (just a placeholder name?) - Uncategorized - Complete
- Larger Audio Buttons (Play/Pause)? - Uncategorized - Complete