Sam ask Pon Please – What Day/Date will new Cable TV lines be installed?

Priority: Urgent
Status: Complete
Specialty:
Location:
Responsible: Pon, Sam

High Priority.

I want to have 5 additional Cable TV lines installed in different locations (True Move allows for 6 maximum):

  • Dad’s room
  • 2nd bedroom
  • upstairs bedroom
  • kitchen
  • Northeast bedroom (servants area)

Please advise who is doing this and when as I need to provide specific details about where the cable needs to be run.