Front Stair and Terrace Finishing?

Priority: Medium
Status: Complete
Specialty:
Location:
Responsible:

(Now in progress).

0800 – Preshar states through translator there is a problem with the architectural drawing specification for finishing the corner of the stairs and the corner of the Terrace.

He states he must know what do by this afternoon.  Please Advise.

20160425_075655

20160425_080352


update 1300 – edge finishing.

20160425_102445