Float Ceiling Down to Crown Molding

Priority: High Priority
Status: Complete
Specialty:
Location:
Responsible: Pon

The sheetrock in the area was installed too high, leaving a gap between it and the crown molding.  It was agreed last week to be corrected, but this was not told to the plaster worker apparently.

20160426_100228